Welcome to …

Plan a project with us? Get a Quote

Pools Construction

Designing pools

Pool Maintenance Service

History

In 2006 people that owned the property spend over $40,000 and build the shell – gunite pool, which was never completed.

In 2007 previous owner, who took property with incomplete construction condition decided not to continue with pool.  Their Contractors made holes in the floor and walls for drain and filled in with dirt – made a landscaping.

20015 New Owners decided that they would like to bring back original plan – Pool in life:

Find out more

Portfolio

pool step tiles completed Pool Tile installed 2006 Sattelite picture of construction chanel for runing pipes to the equipment pad had to big opened Excavating pool started Pool Digging out about to start

CONNECT WITH US

In 2006 people that owned the property spend over $40,000 and build the shell – gunite pool, which was never completed. In 2007 previous owner, who took property with incomplete construction condition decided not to continue with pool. Their Contractors made holes in the floor and walls for drain and filled in with dirt – made a landscaping. 20015 New Owners decided that they would like to bring back original plan – Pool in life: