Welcome to …

Plan a project with us? Get a Quote

Pools Construction

Designing pools

Pool Maintenance Service

History

In 2006 people that owned the property spend over $40,000 and build the shell – gunite pool, which was never completed.

In 2007 previous owner, who took property with incomplete construction condition decided not to continue with pool.  Their Contractors made holes in the floor and walls for drain and filled in with dirt – made a landscaping.

20015 New Owners decided that they would like to bring back original plan – Pool in life:

Find out more

Portfolio

correcting concrete walls after bad concrete contractor work 6 crack repairs 2 Light conduit plumbing and drain in progress Pool Tile installed spa prepared for moving forward walls ready Steps condition and level issue

CONNECT WITH US

In 2006 people that owned the property spend over $40,000 and build the shell – gunite pool, which was never completed. In 2007 previous owner, who took property with incomplete construction condition decided not to continue with pool. Their Contractors made holes in the floor and walls for drain and filled in with dirt – made a landscaping. 20015 New Owners decided that they would like to bring back original plan – Pool in life: